Timber beam-end engineering repairs This was not a typical repair system. Consideration had to be given to all the supporting timber joints with the least amount of disturbance. Click on any of the images for a larger view. |
|||||||||||
|
A series of holes were drilled along the beam to calculate the length of the rot. A timber repair bearing end was manufactured.
End grain drilling to accept the steels.
Dry fit of timber repair system.
Timber repair system bonded to principal timber. |
The existing beam end carefully removed.
Good clean up.
Bars resin bonded.
Finished job with ceiling joists bonded to repair system. |
Beam end removed, note no disturbance to the ceiling laths.
Dry fit of steel work.
Sealing paste. |
|||||||||