|
|
|||||||||||||
|
Specialist Timber Beam Repair Case Study Cockington Court - continued click on pictures for a larger view |
|||||||||||||
![]() |
Left & right: Condition of the beam end |
![]() |
|||||||||||
![]() |
Left & right: Condition of the beam end |
![]() |
|||||||||||
![]() |
Left: Condition of the beam end
Right: Checking pocket and adjusting as required. |
![]() |
|||||||||||
![]() |
|
||||||||||||
![]() |
|||||||||||||
|
New oak beam end manufactured by Property Repair Systems.
|
|||||||||||||
![]() |
Left: New beam end being lowered into position.
Right: Detail |
![]() |
|||||||||||
![]() |
Left: A well deserved brew.
Right: View from below. |
![]() |
|||||||||||
![]() |
Left: Cutting the slot after the drilling process.
Right: First stage of slot cutting. |
![]() |
|||||||||||
![]() |
Left: Detail
Right: Detail |
![]() |
|||||||||||
![]() |
Left: Slot cutting
Right: Re-establishing a connection from joist to beam. |
![]() |
|||||||||||
| contd ........ | |||||||||||||